204-210 Well Street Hackney E9
Project Value - £1.8m
Duration - 24 months
Download Case Study
After successfully delivering two smaller schemes
for our client we were awarded this larger scheme
which involved full refurbishment and conversion
of four one bedroom flats to create four new one
bedroom flats and four two bedroom duplex flats
over the 2nd and 3rd floors.
To create the additional space a rear extension at first floor level and mansard extension had to be constructed.
Works also comprised of full strip out back to brickwork,
extensive structural modifications, M&E and full
fit out.
One of the main reasons we were awarded this
project was our understanding of the clients
requirements to maintain the operation of the
commercial units at ground floor level whist the
works to the upper Levels were carried out.
Careful planning and sequencing of the works
enable us to deliver the works to the clients full
requirements.
Image, shows new mansard extension to the rear
of the building with GRP dormers and single ply
roof coverings .
New timber sliding sash windows,
brick cleaning and repointing.